North Shore Community College Life Sciences Lab
A full lab gut and rebuild between graduation and the fall semester.

The college needed a fully rebuilt teaching lab ready for fall enrollment, and the window was one summer. Dust control gated every phase so adjacent academic departments stayed in operation.
The lab opened on time, ready for instruction, with MEP systems built to teaching-laboratory standards.
- New partitions and custom millwork
- Fume hoods, sinks and emergency eyewash
- Mechanical ventilation, electrical and plumbing
- Epoxy flooring throughout
Related work.

Lynn Public Schools Downtown Campus
A five story former bank headquarters at 195 Market Street, converted into a downtown school campus in two phases.

Gallant Hall Addition at Essex Tech
A new two story, steel framed classroom building added to Gallant Hall on an occupied campus.

Chelsea High School Library & Administration
The library rebuilt over one summer, and the administration offices renovated with the school fully occupied.
Let's Build Something
Great Together.
Ready to discuss your next project? Connect with us to explore how our expertise can lead to lasting success.
