Massey Construction
Academic & Institutional · Danvers, MA

Gallant Hall Addition at Essex Tech

A new two story, steel framed classroom building added to Gallant Hall on an occupied campus.

103Working days, first dig to last panel
2Story steel frame on a working campus
1,500Square feet a floor
3 of 3Participation benchmarks met
The Project

MCC built a ground up, two story classroom building onto Gallant Hall at Essex North Shore Agricultural and Technical School for the school district and Derby Square Architects. The steel framed addition, about 1,500 square feet a floor, puts a 1,690 square foot classroom over a 1,630 square foot lower level classroom and shop, set below the existing basement floor and tied to the original building through a new corridor cut through an existing classroom.

The work took in new foundations with underpinning of the existing foundation, braced frames, steel joists and deck, a rainscreen and aluminum glazing envelope, roofing tied into the existing roof, an accessible ramp, epoxy floors, plumbing, lighting, power and fire alarm, and new site utilities and paving. MCC coordinated the district's separate HVAC contractor and kept building services running on a working campus.

Scope
  • Two story, steel framed classroom addition, about 1,500 square feet a floor
  • A 1,690 square foot classroom over a 1,630 square foot lower level classroom and shop
  • New foundations, underpinning of the existing building and new openings in existing concrete walls
  • Rainscreen panels, aluminum glazing and modified bitumen roofing tied into the existing roof
  • Plumbing, lighting, power and fire alarm on both levels, epoxy flooring and an accessible ramp
  • Earthwork, paving and new water, sanitary and storm utilities
  • The district's separate HVAC contractor coordinated and scheduled by MCC
  • State funded public bid carrying Supplier Diversity Office benchmarks (MBE 7.5%, WBE 13.4%, VBE and SDVOBE 3.0%) and minority and women workforce benchmarks. MCC met all three participation benchmarks
Before and After

Same camera. Same corner.

Drag across the photo to go from April 2026 to October 2026.

Gallant Hall Addition at Essex Tech, October 2026
Gallant Hall Addition at Essex Tech, April 2026
April 2026October 2026
Gallery

Let's Build Something
Great Together.