Massey Construction
Home/Services/Preconstruction
Massey Construction Corp.

Preconstruction

Preconstruction

The best time to bring in a builder is before the design is done.

Most of what a project costs and how long it takes is decided before construction starts. Our preconstruction team prices and plans with you while the design can still change, so the number you approve is one we can build to.

Led by Alexander Corcoran, our Director of Preconstruction, with the project managers and superintendents who will build your job.

01Budgets at Every Stage

A priced estimate at each design milestone, so the design and the budget never drift apart.

02Existing Conditions, Verified

We walk the building, open what needs opening and document what is really there before anyone prices it.

03Constructability Review

Our superintendents and carpenters read the drawings for how the work actually goes together, and flag what will cost time in the field.

04Phasing for Occupied Buildings

A plan for keeping your building open: phases, shutdowns, access, life safety and who goes where, and when.

05Permitting With the Officials

We meet the building, fire and electrical officials early and carry what they require into the scope.

06Open Book Pricing

Every line of the estimate, subcontractor prices you can see, allowances named and nothing buried.

Preconstruction in Practice

The Breakers, Lynn

An occupied oceanfront condominium after a sprinkler pipe burst. The board needed to know the whole scope, and its cost, before committing to construction.

Inside The Breakers, taken down to the studs before the work was scopedBefore: opened up and documented

Nothing committed until the scope and the cost were fully defined.

Dec 2025

A plan before a price

We walked the building and gave the board a renovation approach: life safety first, units returned as clean shells, every scope defined before anyone signed.

Jan 2026

The City in the room

A walkthrough with the City's building and fire officials, then a written life safety compliance summary.

Feb to Apr

Design and field walks

Design with the architect and the electrical engineer; a field walk that grew the scope; a site meeting with the fire, building and electrical inspectors.

May

Opened up and permitted

Exploratory cuts confirmed what was inside the walls, then the stamped permit set.

Jun to Jul

A number the board could act on

An itemized proposal with a bond option, a summary for the lender and a phased payment plan. The board awarded the work.

Sep to Oct

Building with residents at home

Mobilized floor by floor. The new shaft enclosures passed inspection.

Have a project in design?