Massey Construction
Academic & Institutional · Beverly, MA

Beverly High School Field House

A new roof and wall panels on the high school field house, and the structural repairs that followed.

The Project

In 2004 MCC replaced the field house roof at Beverly High School with a Sarnafil membrane over the steel deck, along with new metal wall and soffit panels and Kalwall translucent panels, designed by Symmes Maini & McKee Associates.

In 2005 the City brought MCC back for emergency shoring and structural repairs at a failed beam and column connection, with waterproofing, and a cooking lab renovation.

Scope
  • Field house roof replacement, membrane over steel deck
  • New metal wall and soffit panels
  • Kalwall translucent panels
  • Emergency shoring and structural repairs at a failed beam and column connection (2005)
  • Cooking lab renovation (2005)

Let's Build Something
Great Together.

Ready to discuss your next project? Connect with us to explore how our expertise can lead to lasting success.